1. Points to note when relocating the datacenter
The following points should be noted when moving the datacenter:
But we should pay attention when using the function of migrating the datacenter: each time the datacenter is moved, a large amount of traffic will be consumed, which is 4-8 times the size of the hard drive used by your VPS. Detailed introduction: "The Function of Changing the Computer Room of the Migrant VPS" There is no charge, but it consumes data, please use it reasonably."
In addition, different datacenters that can be migrated to different Banwagonhost packages are different. For example, the Banwagonhost KVM package cannot be migrated to the Banwagonhost CN2 GIA datacenter, and the non-Banwagonhost Hong Kong package cannot be migrated to the Banwagonhost Hong Kong datacenter. For the datacenter relocation rules for bricklayers, please refer to "Detailed Explanation of the Latest Computer Room Replacement Rules for Banwagonhosts in 2021"
2. Steps to move the datacenter by moving bricklayers
Note that if the Banwagonhost IP is blocked, the datacenter migration function of the Banwagonhost cannot be used. You need to change the IP first: "The latest Tutorial on changing the IP of the Banwagonhost VPS for a fee"
Step 1. Log in to the KiwiVM control panel
Open the official website of KiwiVM, click "Services" -> "My Services", which will list all the KiwiVM VPS instances of the user. There will be a "KiwiVM Control Panel" button on the right side of the instance. Click to directly Log in to the KiwiVM control panel of the Banwagonhost VPS instance:
Step 2. Stop moving VPS
Before using the KiwiVM migration datacenter function, you need to shut down the KiwiVM VPS first, that is, stop the instance in the KiwiVM control panel:
Step 3. Start migrating the datacenter
Click "Migrate to another DC" on the left, select the datacenter that needs to be migrated, and click "Confirm on next step" to start the migration:
Step 4. Wait for the migration to be successful
Depending on the size of your VPS, the time it takes to migrate the datacenter varies. Generally, it takes less than half an hour. After the migration is completed, a confirmation message and a new IP address will be sent to your registered email address.
Recommended site searches: registration-free jsp space, in domain name registration, Hong Kong high-defense server, how much does general server hosting cost, server space rental, high-defense server rental, Hong Kong server purchase, US vps host, domain name registration information query, Hong Kong Server recommendations,